NH BASS Federation Nation
Would you like to react to this message? Create an account in a few clicks or log in to continue.
NH BASS Federation Nation

Fishing
 
HomeSearchLatest imagesRegisterLog in

 

 Nashua River Dam @ Stellos

Go down 
AuthorMessage
dandu4

dandu4


Number of posts : 85
Registration date : 2009-07-08

Nashua River Dam @ Stellos Empty
PostSubject: Nashua River Dam @ Stellos   Nashua River Dam @ Stellos EmptyTue Apr 13, 2010 8:08 pm

I went to the Nashua River to inspect the Mines Falls Dam tonight 4/13/10 after numerous reports that the river was extremely low. Visually, it seems to be 3-4 feet down.
I don't think you'll see it going up any time soon until someone rebuilds the left side of the dam opposite the cement spillway. The spillway is usually what is opened to let water out, I believe. As I look at the left side of the dam, most of the (plywood) retaining panels and the supports seem to have been broken away. I've never seen it that way since the dam was built years ago. There is no way to maintain a higher depth throughout the river without those panels in place. It looks like what you see now is what you will have for a while.
I am going to get in touch with the dam management people to see if this is true. I'll get back to you tomorrow.

Dan Dufour (NHBFN CD)
Back to top Go down
dandu4

dandu4


Number of posts : 85
Registration date : 2009-07-08

Nashua River Dam @ Stellos Empty
PostSubject: Re: Nashua River Dam @ Stellos   Nashua River Dam @ Stellos EmptyFri Apr 16, 2010 6:23 am

I made the attempt yesterday 4/15 to get in touch with Algonquin Power who manage the Hydro dam after being directed to do so by Nick Caggiano of the Nashua Parks Department and the city hall.
2 voice mails and 1 email later, nobody has gotten back to me. I will remain persistent and try again today.
I will be back as soon as I get new information.

Dan
Back to top Go down
dandu4

dandu4


Number of posts : 85
Registration date : 2009-07-08

Nashua River Dam @ Stellos Empty
PostSubject: status   Nashua River Dam @ Stellos EmptyFri Apr 16, 2010 9:16 am

I spoke with Rick Covill of Algonquin Power who is the Regional Hydro Dam Manager. He tells me that a crane will be there today to remove debris and the balance of the existing panels (which are virtually doing nothing to hold water at this point). Then they will start replacing the supports & panels immediately. He feels that if all goes well the repairs should be in place and the water level rising in 1-2 weeks.
When asked whether this weekends 1" to 1-1/2" of rain will delay the operation, he said that they should be able to handle that amount and continue working.
So in summation,we are looking at optimistically having the water back in 3 weeks.
Back to top Go down
Sponsored content





Nashua River Dam @ Stellos Empty
PostSubject: Re: Nashua River Dam @ Stellos   Nashua River Dam @ Stellos Empty

Back to top Go down
 
Nashua River Dam @ Stellos
Back to top 
Page 1 of 1
 Similar topics
-
» Nashua River Dam @ Stellos
» Nashua River (New Ramp & Water Chestnut Removal)
» Conn. River 7/31
» Merrimack River
» NEPVA Event June 7th - Charles River, Newton Yacht Club

Permissions in this forum:You cannot reply to topics in this forum
NH BASS Federation Nation :: Federation Nation News :: Conservation News-
Jump to: